Test Stand Upgrade & Cold-Flow Test

posted in: Blog 2020 | 0

The last test series ended after the structure of TS-02 was inaugurated in February 2020 with several hot-fire engine tests, in which the remaining hardware of TS-01 was combined with the new engine “Amalia”. The engine was designed for use … Continued

10th anniversary

posted in: Blog 2020 | 0

10 years ago, on November 3rd 2010, the TU Wien Space Team was founded by a small group of motivated students. Initiator and first president Fabian Duschel got inspired on a semester abroad at the university INSA Lyon by the … Continued

Situation during COVID-19

posted in: Blog 2020, General | 0

Dear Readers, we have received numerous questions about our work during these tough times, which is why we would like to take the opportunity to talk about the situation in our team. The ongoing SARS-CoV-2 epidemic and its consequences on … Continued

Swagelok Safety Workshop

posted in: General | 0

In the course of our current mission, the development of a liquid rocket, piping has become an increasingly important topic. In order to ensure successful and safe operation of the piping system, great care must be taken to avoid critical … Continued

DISCO One: Workshop Autumn 2019

posted in: Blog 2019, CubeSat | 0

On the weekend from 15.11.2019 to 17.11.2019 the Kick-Off Event of the CubeSat DISCO One Team took place. All members met at the Institute for Manufacturing Engineering and Photonic Technologies (IFT) of TU Wien to work together on DISCO One. … Continued