After designing and building the pieces of the airframe, we can finally start with creating STR-06!
At the beginning of February our team used the workshop of Peak Technology in order to build the airframe. With prepregs, two CFK pipes and two stackcups laminated with GFK were placed in an autoclave and hardened overnight. The next day the individual sections needed to be cooled in order to finalize their production process.
Our heartfelt gratitude to Peak Technology for letting us use their workshop!
Fertigung bei Peak